Additional Natural Gas CHP Equipment

By | April 29, 2020

If sufficient gas is not available, the CHP automatically reduces its output to match the minimum gas quantity available. However, in order to be able to continue operation of the CHP at high load and optimally supply the property with electricity and heat, a 2G gas mixing line can be installed. This line mixes the lean gas from sewage treatment plants, landfills or mines with up to 100% natural gas.

Please read the originial post here: https://www.evoet.com.au/additional-natural-gas-equipment/